For wood and cement fiber siding generally use 1 by 4 boards overlapped at the corners.
Garage slab siding starter course 6 clearance.
Cut vinyl pieces to fit with a saw or snips.
Ever wonder if siding is too close to the ground.
For vinyl use special trim strips which should come with the.
This article will examine just that question of the recommended distance from ground and siding your clearance is vitally important for the siding s long term protection and safeguard.
Start with a level chalk line for the bottom starter strip and check the level periodically as you go up.
In order for the siding to be installed properly in a level fashion the starter strip at the bottom of the wall must be level.
6 equipment 7 material estimating 8 nomenclature getting started 9 preparation 10 furring and installation techniques 12 base chalk line 13 inside corner 14 outside corner trim 15 starter strip 16 window and door trim 17 window and door trim gable end trim installation 18 cutting procedures 19 installing the siding first course lapping.
Measure the height of the piece you need to cut by butting a scrap piece of siding beneath and above the window and marking the necessary height leaving an additional 1 4 inch 0 6 cm of clearance.
If horizontal siding is used a j channel or starter strip must be used.
Then nail a 3 1 2 in.
Determine the lowest point of the wall that will be sided.
Fiber cement siding gap clearance caulking specifications the following information is adapted expanded a bit from certainteed corporations installation instructions for the company s fiber cement siding products as this is the most comprehensive guide we could find for caulking clearance instructions when installing fiber cement siding.
As shown in the diagram a wooden spacer can be used to provide the proper angle for the first strip.
Use j channel to receive vertical siding.
Step 6 finish your garage siding with trim.
If starter strip is used it is necessary to provide at least 3 8 9 5mm clearance for proper engagement of the siding.
Siding materials need proper clearances between finish grade and the siding regardless the type of siding.
Drill minimum 3 16 4 8mm diameter weep holes in the bottom of the j channel no more than 24 610mm.
Having your siding too close to the ground is just asking.
Most manufacturers produce a starter strip that secures the bottom course of siding to the sheathing and holds it at the proper angle.
Maintaining proper clearances reduces access to wood structures behind the siding by wood destroying insects or damage from water that might.
Transfer this measurement onto the piece of siding.
Leave on extra 1 4 inch 0 6 cm of clearance on either side of these marks.
This should be nailed every 6 inches with it s lower edge running along the chalk line.
From that point measure up 1 4 6 4mm less than the width of the starter strip and partially drive a nail at one corner.